What standard applies?
The starting point is the contract: specifications, samples, drawings, tolerance ranges, inspection standards and acceptance criteria. Where the contract is silent, statutory quality requirements and trade usage may apply, but an implied standard is a weaker foundation than an express one.
Notice and inspection periods
Buyers are generally expected to inspect goods within the agreed period, or within a reasonable time, and to notify the supplier of non-conformity. A late notice weakens the claim and may, depending on the contract, be treated as acceptance. This is the single most common difficulty in quality disputes.
Testing and expert evidence
Third-party inspection or laboratory testing is often decisive, particularly where the defect is not visible. The value of such evidence depends heavily on the chain of custody and on whether the sample can be shown to come from the disputed batch.
Damages and mitigation
Recoverable loss typically includes direct losses such as rework, return freight and price reductions, and may extend to consequential loss where it was foreseeable and provable. Steps taken to mitigate loss are generally expected, and a failure to mitigate can reduce recovery.